|
|
Concrete Slab-Concrete Slab Construction Video
Concrete Slab Construction Concrete Slabs DVD Concrete Slab Video. Water down the grade a day before pouring concrete and prior to pouring concrete slab, preventing water from being absorbed from the concrete mixture. Have a designated area for the Ready-mix truck to wash out, or wheelbarrow. Delivery drivers will put there own shoots on and discharge concrete. Let the driver know what slump you want before pouring concrete slab. Most drivers should be able to accommodate the desired slump(Moisture content). (6 inch slump min. 7 inch slump max. suggested) Have enough help with you leveling the concrete as your pouring the slab. Pour 1/3 of the concrete slab, Stop, Rod off. Then repeat this process until done. Start Tamping. While Tamping, your helpers can use a Magnesium float to level the edges to existing concrete slab and (Bullfloat after Bleeding minimizes.) Not Bleeding, Bullfloat immediately . Then, edge perimeters of the drive with a Walking Edger. Concrete Slab-Concrete Slab DVD. Click here to get started: Concrete Slab Construction
|
|||||||||||||||