pour concrete driveway
Pouring concrete helpful
hints to help you with your concrete project.
Water down the grade
a day before pouring concrete and prior to pouring, preventing water from
being absorbed from the concrete mixture
Have a designated
area for the Ready-mix truck to wash out, or wheelbarrow.
Delivery drivers will put there own shoots on and discharge concrete.
Let the driver know what slump you want before pouring concrete. Most
drivers should be able to accommodate the desired slump(Moisture content).
(6 inch slump min. 7 inch slump max. suggested)
Time is a factor, don't waist any time pouring out, Rodded off and Tamped.
Note; (The longer it takes the faster the concrete will set.)
Have enough help with
you leveling the concrete as your pouring. Pour 1/3 of the driveway, Stop,
Rod off. Then repeat this process until done.
Do not over pour!
Start Tamping. While
Tamping, your helpers can use a Magnesium float to level the edges to
existing concrete and
forms. After Tamping, your driveway
should Bleed.
(Bullfloat after Bleeding
minimizes.) Not Bleeding, Bullfloat immediately .
Starting from where you started the pour, Bullfloat the slab in two different
directions, if possible, to assure a level surface.
Then, edge perimeters
of the drive with a Walking Edger.
Edging, takes a light touch the first go round, be careful not to push
the edge down. If so, bring it back using a Magnesium float.
Click here to get started: pour concrete driveway
• Check out this free demo
• Visit the Store
|